Contractor
DJ&A, P.C.
- UEI
- ET9MWK3PM4U6
- Parent UEI
- ET9MWK3PM4U6
- Resolved by
- uei
- Confidence
- 1.000
Active from Aug 1, 2019 to Aug 20, 2026.
Sign in to watchWhat they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Engineering Services | 40 | $14,396,448 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 69056723F00076N ID FLAP FS SC MULTI(1), CUSTER MOTORWAY AND YANKEE FORK ROAD IMPROVEMENTS ENVIRONMENTAL TASKS | Department of Transportation | MT | Aug 15, 2023 | $54,092 |
| 69056725F00083N A/E GEOTECHNICAL INVESTIGATION FOR WY NP GRTE 10(1) BUFFALO FORK CAUSEWAY, GRAND TETON NATIONAL PARK, WYOMING | Department of Transportation | MT | Sep 26, 2025 | $231,829 |
| 140P2026F0205 DEVA 352126/152128 - REPAIR UNPAVED ROADS - UP TO PDS | Department of the Interior | CA | Aug 20, 2026 | $238,671 |
| 69056726F00062N A/E FOR WA PWRO 2010(1) 2026 MORA BRIDGES VALUE ANALYSIS/PE SUPPORT | Department of Transportation | MT | Apr 8, 2026 | $70,940 |
| 6982AF26F00017N NM FS SNTFE310 263(1) GALLINAS CANYON ROAD SCOPING AND PREPARE CONCEPT LEVEL PLAN SHEET | Department of Transportation | NM | Jan 6, 2026 | $1,290,482 |
| 6982AF19D000006 ARCHITECT-ENGINEER PROJECT DEVELOPMENT AND POST-DESIGN SERVICES INDEFINITE-DELIVERY, INDEFINITE-QUANTITY CONTRACT | Department of Transportation | — | Aug 1, 2019 | — |
| 6982AF23F00117N NM BR AAO EL VADO HERON & EL VADO ROAD REHABILITATION - PRELIMINARY AND FINAL DESIGN | Department of Transportation | MT | Aug 4, 2023 | $605,642 |
| 6982AF22F00105N NM BR AAO EL VADO HERON & EL VADO ROAD REHABILITATION | Department of Transportation | MT | Jun 9, 2022 | $67,101 |
| 140P8626F0015 TITLE I - TOPOGRAPHIC SURVEY & MAPPING SERVICES REHABILITATE SOL DUC WATER DISTRIBUTION SYSTEM OLYMPIC NATIONAL PARK - PMIS 329853 | Department of the Interior | WA | Aug 17, 2026 | $156,687 |
| 6982AF25F00083N NM BR AAO EL VADO HERON & EL VADO ROAD REHABILITATION - POST DESIGN TASK ORDER | Department of Transportation | MT | Sep 16, 2025 | $20,000 |
| 140PS126F0061 SEKI: TITLE III CLOVER CREEK WWDFS | Department of the Interior | CA | Aug 17, 2026 | $186,369 |
| 140P2026D0003 NATIONWIDE GENERAL ARCHITECT/ENGINEERING (A/E) PROFESSIONAL SERVICES - MULTIPLE AWARD TASK ORDER CONTRACT, INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) WITH DJ&A | Department of the Interior | — | Mar 20, 2026 | — |
| 140P2024F0256 YOSE-228661-HODGDON MEADOWS DD/CD/SS. THIS PROJECT IS TO THE DESIGN AND ENGINEERING TO REPLACE APPROXIMATELY 12,000 LINEAR FEET OF AGING ASBESTOS CEMENT WATER MAIN REMOVE AND REPLACE APPROXIMATELY 30 SERVICE LATERALS AT 50 LINEAR FEET EACH INSTALL | Department of the Interior | CA | Jul 15, 2024 | $878,776 |
| 69056726F00092N A/E FOR MT FLAP SILVER 2021(1) ROOSEVELT DRIVE SAFETY/PE SUPPORT | Department of Transportation | MT | Jul 24, 2026 | $29,320 |
| 6982AF25D000003 ARCHITECT & ENGINEER (BROOKS ACT) FULL SERVICE DESIGN INDEFINITE DELIVERY-INDEFINITE QUANTITY CONTRACT THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE REVOLUTIONARY FEDERAL ACQUISITION REGULATION OVERHAUL (RFO) CLAUSE 52.222-90 ADDRESSING DE | Department of Transportation | — | Jul 20, 2026 | — |
| 69056726F00078N A/E FOR WA NP NOCA 100 (1) COMPANY CREEK ROAD ALTERNATIVE FEASIBILITY ANALYSIS | Department of Transportation | MT | Jul 17, 2026 | $20,332 |
| 69056724F00060N MIDSLOPE ATTENUATORS STUDY PHASE 2 | Department of Transportation | MT | Jul 17, 2026 | $519,936 |
| 140P8526F0069 TITLE II DESIGN DEVELOPMENT AND FINAL CONSTRUCTION DOCUMENTS SERVICES, RECONSTRUCT SOUTH FORK FOOT BRIDGE IN UPPER PARADISE VALLEY, SEQUOIA/KINGS CANYON NATIONAL PARKS, CALIFORNIA | Department of the Interior | CA | Jul 16, 2026 | $226,553 |
| 140F0822D0224 THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT, CLARIFY ORDERING | Department of the Interior | — | Mar 25, 2026 | — |
| 1240LU24F0006 ERFO EAST ROSEBUD ROAD #2177 FINAL DESIGN PS&E | Department of Agriculture | MT | Jul 10, 2026 | $308,864 |
| 140P8524F0039 TITLE III CONSTRUCTION MANAGEMENT SERVICES, REHABILITATE KALALOCH WASTEWATER TREATMENT SYSTEM, OLYMPIC NATIONAL PARK SERVICE, WASHINGTON MODIFICATION P00003 IS FOR A NO COST TIME EXTENSION FROM 4/15/2026 TO 7/15/2026. THE EXTENSION IS NEEDED DUE | Department of the Interior | WA | Apr 15, 2026 | $29,901 |
| 140P2026F0177 CAVE 332397 REPLACE MAIN WATER DISTRIBUT | Department of the Interior | NM | Jul 8, 2026 | $346,040 |
| 69056724F00078N WY NPS GRTE 2020(1), MOOSE WILSON ROAD PHASE 2, CONSTRUCTION SUPPORT. THIS MODIFICATION REVISES LABOR HOURS ACROSS MULTIPLE CLASSIFICATIONS AND INCREASES AMOUNT $50,000. | Department of Transportation | MT | Jul 8, 2026 | $230,000 |
| 140P8526F0071 TITLE II DESIGN DEVELOPMENT AND FINAL CONSTRUCTION DOCUMENTS SERVICES TO REHABILITATE KALALOCH WATER DISTRIBUTION PUMP SYSTEM - PMIS 339718, OLYMPIC NATIONAL PARK, WA | Department of the Interior | WA | Jul 8, 2026 | $157,193 |
| 140P1425F0045 SCHEMATIC DESIGN, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, AND SUPPLEMENTAL SERVICES FOR THE REHABILITATION OF LODORE WASTEWATER SYSTEM FOR DINOSAUR NATIONAL MONUMENT - MODIFICATION 1 - SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE AND POP EXTENSIO | Department of the Interior | MT | Jul 2, 2026 | $107,076 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier ET9MWK3PM4U6, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 27, 2026.