Skip to content
BidBenchmark

Contractor

NORTHROP GRUMMAN SYSTEMS CORPORATION

DULLES, VA
UEI
Q11ZHUFBW741
Parent UEI
NKVZLJL93QT6
Resolved by
uei
Confidence
1.000
Obligated to date
$6,296,100,0541
Awards
14
Agencies served
2

Active from May 28, 2014 to Aug 24, 2026.

Sign in to watch

Recent awards

AwardAgencyPlaceFirst actionCurrent value
80ARC024CA007

HELIOSWARM PROGRAM SUPPORT

National Aeronautics and Space AdministrationVASep 24, 2024$90,130,768
NNH15CN76C

IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS

National Aeronautics and Space AdministrationVASep 3, 2015$1,880,334,464
80GSFC24CA045

STRATOSPHERE TROPOSPHERE RESPONSE USING INFRARED VERTICALLY-RESOLVED LIGHT EXPLORER (STRIVE) SPACECRAFT AND MISSION OPS PHASE A

National Aeronautics and Space AdministrationVAAug 21, 2024$3,993,999
NNG14FC04C

THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES.

National Aeronautics and Space AdministrationVAMay 28, 2014$103,452,107
NNG15VE05D

JOINT POLAR SATELLITE SYSTEM-2, 3, AND 4 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2, 3, AND 4 SPACECRAFT MISSION.

National Aeronautics and Space AdministrationAZMay 14, 2026$606,725,061
NNJ16GU21B

ISS COMMERCIAL RESUPPLY SERVICES 2

National Aeronautics and Space AdministrationMar 19, 2026
80GSFC22CA018

ICESAT-2 MISSION OPERATIONS CENTER (MOC) SUPPORT CENTER CONTRACT - PROVIDE HIGHLY SPECIALIZED ENGINEERING SERVICES FOR MISSION OPERATIONS SUPPORT TO MEET ICESAT-2 SCIENCE OBJECTIVES.

National Aeronautics and Space AdministrationVAApr 3, 2026$30,922,086
80MSFC24CA014

STABLE: SYSTEMS TECHNOLOGIES FOR ARCHITECTURE BASELINE

National Aeronautics and Space AdministrationVAMar 12, 2026$3,502,252
80GSFC26C0013

HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES

National Aeronautics and Space AdministrationVAMay 11, 2026$21,241,364
FA880725DB003

DESIGN, DEVELOP, TEST, AND PRODUCE GLOBAL VARIANTS OF THE PROTECTED TACTICAL SATCOM SPACE VEHICLES, ASSOCIATED GROUND SYSTEMS AND ANCHOR STATIONS.

Department of DefenseMay 5, 2026
FA881926FB022

CONCEPT DEVELOPMENT MINIMUM GUARANTEE

Department of DefenseCAApr 29, 2026$100,000
FA881925CB002

RAPID ON ORBIT SPACE TECHNOLOGY EVALUATION RING (ROOSTER-5) INTEGRATION, TEST, AND OPERATIONS EFFORTS

Department of DefenseVAMar 4, 2026$73,131,732
FA881926DB001

THIS IS A MULTIPLE-AWARD INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) TO DEFINE, DESIGN, AND BUILD TECHNOLOGIES AND SPACE-BASED SYSTEMS FOR THE SPACE DOMAIN AWARENESS MISSION AREA.

Department of DefenseApr 2, 2026
FA881422C0004

RAPID ON-ORBIT SPACE TECHNOLOGY EVALUATION RING

Department of DefenseVAMar 11, 2026$87,032,307

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.

  1. 1Awards are attributed by Unique Entity Identifier Q11ZHUFBW741, the government's own recipient identifier, not by name matching.
  2. 2Award records from USAspending.gov, last refreshed Aug 27, 2026.
NORTHROP GRUMMAN SYSTEMS CORPORATION federal contracts · BidBenchmark