Contractor
SOUTHWEST RESEARCH INSTITUTE
- UEI
- PB11V1KH3KV4
- Parent UEI
- PB11V1KH3KV4
- Resolved by
- uei
- Confidence
- 1.000
Active from Apr 21, 2004 to Aug 24, 2026.
Sign in to watchWhat they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Engineering Services | 18 | $287,629,077 |
| Software Development | 2 | $7,559,313 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 68HERC25D0007 R425 - SUPPORT FOR TESTING AND ANALYTICAL SERVICES FOR REGULATION OF MOTOR VEHICLES, ENGINES, FUELS AND FUEL ADDITIVES | Environmental Protection Agency | — | Jul 8, 2025 | — |
| NNG05EC87C LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE | National Aeronautics and Space Administration | TX | Mar 16, 2005 | $41,719,831 |
| 89233126CNA000450 HYPERION - SHALL PROVIDE INDEPENDENT SCIENTIFIC, TECHNICAL, ENGINEERING, OPERATION AND MAINTENANCE TO INCLUDE RESEARCH AND DEVELOPMENT SERVICES. | Department of Energy | TX | Jun 30, 2026 | $60,000,000 |
| 80GSFC25CA023 SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS. | National Aeronautics and Space Administration | TX | Dec 23, 2024 | $60,285,745 |
| 68HERC25F0335 PSC- R425 NEW TASK ORDER "PARTICULATE EMISSIONS MASS INSTRUMENT CALIBRATION" COST-PLUS FIXED-FEE (CPFF) COMPLETION TYPE, 24-MONTH PERIOD OF PERFORMANCE | Environmental Protection Agency | TX | Aug 28, 2025 | $640,534 |
| 31310026F0084 DRY CASK STORAGE MODELING USING GOLDSIM SOFTWARE | Nuclear Regulatory Commission | TX | Aug 20, 2026 | $99,707 |
| 31310023F0143 TECHNICAL ASSISTANCE FOR REVIEW OF THE DOE NON HIGH LEVEL WASTE DETERMINATIONS | Nuclear Regulatory Commission | TX | Sep 25, 2023 | $2,045,934 |
| 31310023D0005 ENTERPRISE WIDE IDIQ CONTRACT FOR THE CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES WORK FOR OTHERS TECHNICAL ASSISTANCE AND RESEARCH SUPPORT OF ACTIVITIES UNDER THE RESPONSIBILITY OF THE NUCLEAR REGULATORY COMMISSION PROGRAM OFFICES | Nuclear Regulatory Commission | — | May 31, 2023 | — |
| 89233124CNA000374 APEX DEVELOPMENT, DESIGN, FABRICATION, TESTING AND INSTALLATION FOR THE OFFICE OF DEFENSE NUCLEAR NONPROLIFERATION | Department of Energy | TX | Jul 30, 2024 | $63,167,398 |
| NNG04EB99C TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION | National Aeronautics and Space Administration | TX | Apr 21, 2004 | $391,932,243 |
| 31310023D0004 ENTERPRISE WIDE CONTRACT FOR THE OPERATION OF THE CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES AS THE NRC'S FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC)-SEVENTH RENEWAL | Nuclear Regulatory Commission | — | Mar 29, 2023 | — |
| NNM06AA75C THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HAS SELECTED JUNO NEW FRONTIERS MISSION UNDER THE DIRECTION OF PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON TO CONTINUE DEVELOPMENT WITH THE EXPECTATION THAT THE JUNO MISSION WILL ENTER PHASE B IN EARLY FISCAL YEAR 2006. THE JUNO MISSION WILL BE MANAGED BY THE MARSHALL SPACE FLIGHT CENTER, NEW FRONTIERS PROGRAM OFFICE. KEY JUNO TEAM MEMBERS INCLUDE DR. BOLTON'S HOME INSTITUTION, THE SOUTHWEST RESEARCH INSTITUTE (SWRI), THE JUNO IMPLEMENTATION TEAM LEADER JET PROPULSION LABORATORY (JPL) AND THE SPACECRAFT BUS PROVIDER THE LOCKHEED MARTIN SPACE SYSTEMS DIVISION (LM/SS). THE PI'S TEAM AT SWRI NEEDS TO BEGIN WORK ON A SUBSET OF PHASE B ACTIVITIES AS EARLY IN FY06 AS POSSIBLE. THIS SOW PROVIDES A LIST OF ACTIVITIES THAT ARE NECESSARY TO BEGIN WORK IN FY06 AND THEIR ASSOCIATED DELIVERABLES. THE JUNO MISSION IS A COLLABORATION BETWEEN SOUTHWEST RESEARCH INSTITUTE (SWRI), JPL, LOCKHEED MARTIN (LM), AND A COMPLEMENTARY TEAM OF UNIVERSITIES AND FIELD CENTERS. THE PRINCIPAL INVESTIGATOR, DR. SCOTT BOLTON, IS AT SOUTHWEST RESEARCH INSTITUTE (SWRI) AND IS RESPONSIBLE TO NASA FOR ALL ASPECTS OF THE MISSION INCLUDING ACHIEVING ALL SCIENTIFIC OBJECTIVES AND MISSION GOALS. JPL PROVIDES THE PROJECT MANAGER WHO OVERSEES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT AND WILL REPORT TO THE PI. PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON IS RESPONSIBLE TO NASA FOR MEETING THE SCIENTIFIC OBJECTIVES OF THE JUNO MISSION WITHIN COST AND SCHEDULE. AS PI, DR. BOLTON HAS DIRECT ACCOUNTABILITY TO THE NASA NEW FRONTIERS PROGRAM OFFICE FOR THE IMPLEMENTATION OF JUNO. ALL JUNO SCIENCE CO-IS, THE DEPUTY PI AND PROJECT SCIENTIST, THE SCIENCE INVESTIGATION OFFICE MANAGER, THE E/PO EFFORT, THE JUNO ADVISORY BOARD AND THE PM REPORT DIRECTLY TO DR. BOLTON. THE PI DELEGATES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT TO THE PROJECT MANAGER (PM), RICK GRAMMIER. THE PROJECT SYSTEM ENGINEER, PAYLOAD MANAGER, FLIGHT SYSTEM MANAGER, MISSION MANAGER, SCIENCE OPS CENTER, BUSINESS MANAGER, LM CONTRACT CTM, AND MISSION ASSURANCE MANAGER ALL REPORT DIRECTLY TO THE PM. | National Aeronautics and Space Administration | TX | Feb 23, 2006 | $184,270,441 |
| 80GSFC24F0001 DEVELOPMENT OF THE QUICKSOUNDER SC AND THE QUICKSOUNDER SATELLITE, INTEGRATION OF THE ATMS EDU, SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPS & SATELLITE ACTIVATION, 3 YRS OF MISSION OPS & PERFORM DECOMMISSIONING OPERATION | National Aeronautics and Space Administration | TX | Oct 25, 2023 | $53,141,501 |
| NNM09AA24C STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS OF NASAS PLANETARY SCIENCE PROGRAM. | National Aeronautics and Space Administration | TX | Sep 14, 2009 | $36,845,136 |
| 80GSFC20C0053 SOLAR ORBITER SPICE PHASES E/F EFFORT | National Aeronautics and Space Administration | TX | Apr 29, 2020 | $8,492,737 |
| 80GSFC21C0055 SOLARIS PHASE A MISSION SUPPORT. SOLARIS IS A SOLAR POLAR MISSION OF DISCOVERY TO ADDRESS FUNDAMENTAL QUESTIONS ABOUT THE SUN AND HELIOSPHERE THAT CAN ONLY BE ANSWERED FROM A HIGH LATITUDE (POLAR) VANTAGE POINT. | National Aeronautics and Space Administration | TX | Mar 19, 2021 | $1,195,000 |
| 693JK425D600006 ESTABLISH A 5-YEAR TESTING AND RAPID PROTOTYPING FOR INTEROPERABLE AUTOMATION SAFETY (TRPIAS) V IDIQ FOR INTEGRATED TESTING/VALIDATION AND RAPID PROTOTYPING OF SAFETY-CRITICAL TECHNOLOGIES TO ADVANCE TRANSPORTATION/AUTOMATION SAFETY AND EFFICIENCY. | Department of Transportation | — | Sep 24, 2025 | — |
| 75N95026D00008 EO 14398 IDIQ: CHEMISTRY, MANUFACTURING AND CONTROLS AND RELATED SERVICES FOR DEVELOPMENT OF DRUG SUBSTANCES (TRND 1) | Department of Health and Human Services | — | Aug 4, 2026 | — |
| 693JJ923D000061 STANDARDS ENFORCEMENT PROGRAM FOR FMVSS NO. 304, "COMPRESSED NATURAL GAS FUEL CONTAINER INTEGRITY INITIATE SMALL BUSINESS REVIEW TO SUPPORT NEW REQUEST FOR PROPOSAL FOR A CONTRACT TO CONDUCT COMPLIANCE TESTING TO FMVSS NO. 304, "COMPRESS | Department of Transportation | — | Sep 27, 2023 | — |
| 31310025C0023 RADIOCHEMICAL SAMPLE ANALYSIS SUPPORT FOR DECOMMISSIONING SITES | Nuclear Regulatory Commission | TX | Mar 31, 2026 | $387,435 |
| 31310023F0142 TECHNICAL ASSISTANCE FOR DEVELOPMENT OF REGULATORY AND TECHNICAL ANALYSES SUPPORTING 10 CFR PART 61 | Nuclear Regulatory Commission | TX | Sep 21, 2023 | $1,886,165 |
| 31310024F0137 RESEARCH AND GUIDANCE DEVELOPMENT ASSISTANCE ON INNOVATIVE METHODS AND TECHNOLOGIES TO ENHANCE SAFETY FOR DESIGN AND CONSTRUCTION OF NEW COMMERCIAL NUCLEAR POWER PLANTS | Nuclear Regulatory Commission | TX | Sep 17, 2024 | $1,251,257 |
| 80NSSC25PB125 NASGRO PRESSURE VESSEL DEVELOPMENT PLAN PHASE 12 | National Aeronautics and Space Administration | CA | Jul 22, 2026 | $115,000 |
| 80GSFC25CA025 MODIFICATION 7: INCORPORATE THE REVISED SPEC DOCUMENT AT NO ADDITIONAL COST. | National Aeronautics and Space Administration | TX | Mar 6, 2026 | $26,162,610 |
| 693JK426F96023N THIS TASK ORDER IS ISSUED UNDER TESTING AND RAPID PROTOTYPING IN SUPPORT OF INTEROPERABLE AUTOMATION SAFETY TRPIAS IDIQ CONTRACT NO.693JK425D600006 FOR SPOOFING INTEGRITY LIBRARY FOR L-BANDS (SILL) - GPS DATA SPOOFING TEST VECTOR DEVELOPMENT FOR AUTO | Department of Transportation | DC | Jul 16, 2026 | $499,601 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier PB11V1KH3KV4, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 27, 2026.