Contractor
THE BOEING COMPANY
- UEI
- D27FSZD2L2U9
- Parent UEI
- NU2UC8MX6NK1
- Resolved by
- uei
- Confidence
- 1.000
Active from Jun 19, 2017 to Aug 13, 2026.
Sign in to watchWhat they win
Benchmark categories this contractor appears in, by award count.
| Category | Awards | Obligated |
|---|---|---|
| Program Management Support | 1 | $2,274,472 |
Recent awards
| Award | Agency | Place | First action | Current value |
|---|---|---|---|---|
| 80LARC17F0001 IGF::OT::IGF ARC JET TEST IN SUPPORT OF FLEXIBLE THERMAL PROTECTION SYSTEM EVALUATION AND DEVELOPMENT THE SCOPE OF THIS TASK ORDER IS TO EVALUATE FTPS LAYUPS AND MATERIALS AT COMPARABLE OR HARSHER SIMULATED ATMOSPHERIC REENTRY FLIGHT CONDITIONS. FTPS MATERIALS AND SYSTEMS WILL BE TESTED UTILIZING THE TEST FACILITY FOR UP TO 10 WEEKS OF TOTAL TEST TIME AT THREE SPECIFIC TEST CONDITIONS THAT SIMULATE RELEVANT TEST ENVIRONMENTS.THE OBJECTIVES FOR THIS TASK ORDER ARE AS FOLLOWS: OBJECTIVE ONE: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 50 W/CM2 (HEAT FLUX BETWEEN 17 AND 50 W/CM2, PRESSURE BETWEEN 1.7 AND 10KPA). OBJECTIVE TWO: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 50-75 W/CM2 (HEAT FLUX BETWEEN 50 AND 75 W/CM2, PRESSURE BETWEEN 3 AND 6KPA). OBJECTIVE THREE: EVALUATION OF FTPS LAYUPS AND MATERIALS AT FLIGHT-LIKE CONDITIONS SIMULATING A HEAT FLUX ENTRY CONDITION (SQUARE PULSE OR MISSION PROFILE IN STAGNATION OR SHEAR) OF 75-130 W/CM2 (HEAT FLUX BETWEEN 75 AND 130 W/CM2, PRESSURE BETWEEN 3 AND 10 KPA). | National Aeronautics and Space Administration | MO | Jun 19, 2017 | $558,048 |
| 693KA721C00010 THE BOEING COMPANY CONTRACT 693KA7-21-C-00010 TO FUND FUTURE AIR NAVIGATION SYSTEM FANS SUPPORT | Department of Transportation | DC | Jun 29, 2026 | $2,274,472 |
| NNG17PX06C THIS CONTRACT IS FOR THE DESIGN AND FABRICATION OF RADIATION HARDENED CHIPLET DEVICES | National Aeronautics and Space Administration | MO | Apr 29, 2026 | $31,401,818 |
| NNL17AA45T FUELEAP (FOSTERING ULTRA-EFFICIENT, LOW-EMITTING AVIATION POWER) POWER SYSTEM DESIGN, ANALYSIS, AND TESTING THE SCOPE OF THIS TASK ORDER IS TO DEVELOP ENGINEERING DATA TO SUPPORT THE DESIGN AND DEVELOPMENT OF A HEAVY-FUEL, HYBRID-ELECTRIC SOFC POWER SYSTEM (SOFC POWER SYSTEM) FOR AN AIRBORNE FLIGHT DEMONSTRATOR. THIS INCLUDES IDENTIFYING SYSTEM-LEVEL TRADEOFFS, IDENTIFYING PERFORMANCE, COST AND RISK OF DESIGN ALTERNATIVES, SELECTING COMPONENTS, AND QUANTIFYING SYSTEM PERFORMANCE THROUGH INTEGRATED ANALYSIS AND TESTING. THIS TASK ORDER SHALL GENERATE PRELIMINARY DESIGN DATA, TEST PLANS, AND SHALL EXECUTE COMPONENT-LEVEL AND INTEGRATED TESTED FOR SELECTED HIGH-RISK COMPONENTS, INCLUDING THE SOFC STACK AND FUEL REFORM | National Aeronautics and Space Administration | MO | Apr 28, 2026 | $2,211,757 |
| NNL17AA44T DFM SIMULATION THE SCOPE OF THIS TASK ORDER IS TO UPGRADE THE CAPABILITIES OF AN AFP PSS PACKAGE SO THAT IT BETTER INFORMS THE PART DESIGNER AND ANALYST OF MANUFACTURING CONSTRAINTS AND IMPACTS OF DESIGN DECISIONS ON PART PERFORMANCE AND QUALITY. THE CONTRACTOR SHALL VALIDATE THESE NEW SOFTWARE CAPABILITIES AS PART OF THIS TASK ORDER. THE UPGRADED SOFTWARE WILL ALLOW NASA TO BETTER DESIGN AND ANALYZE COMPOSITE PARTS MADE ON THE INTEGRATED STRUCTURAL ASSEMBLY OF ADVANCED COMPOSITES ISAAC AFP SYSTEM IN SUPPORT OF THE ACP AND OTHER NASA PROJECTS. | National Aeronautics and Space Administration | MO | Apr 15, 2026 | $641,769 |
| HQ072726FE004 THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRES PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS FOR THE SEA SWARMING PLATFORMS FOR INSTRUMENTATION AND DESTRUCT RELAY (SEASPIDR) WIDOW 2.0 SYSTEM. | Department of Defense | VA | Apr 2, 2026 | $2,631,768 |
| N0001423C1027 BOEING SHALL PROVIDE SUPERSONIC INLET BLEED EXPERIMENTS OF CURVED SURFACES FOR COMPUTATIONAL FLUID DYNAMICS MODELING WITH THE SUPPORT OF NC STATE UNIVERSITY RESEARCH TEAM. | Department of Defense | MO | Mar 31, 2026 | $1,243,500 |
| FA875024CB013 FORSEE | Department of Defense | MO | Mar 30, 2026 | $11,047,737 |
| FA930222P0021 MMRS ANNUAL MAINTENANCE RENEWAL AND SOFTWARE UPGRADE | Department of Defense | CA | Mar 30, 2026 | $40,300 |
| HQ072716D0007 ATSP4 FULL& OPEN PERFORMANCE WORK STATEMENTVISION STATEMENTTHE DEFENSE MICROELECTRONICS ACTIVITY (DMEA) ATSP4 IS A UNIFORM TECHNICAL AND MANAGEMENT APPROACH THAT LEVERAGES ADVANCED TECHNOLOGIES TO MEET THE REQUIREMENTS OF THE DEPARTMENT OF DEFENS | Department of Defense | — | Mar 27, 2026 | — |
| HQ072726FE015 THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRES PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS FOR THE AN/ALE-47 SYSTEM AS INSTALLED ON THE P-8A POSEIDON AIRCRAFT. | Department of Defense | WA | Mar 4, 2026 | $1,377,469 |
Sources and method
Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.
Totals sum obligations across every award attributed to this contractor. Obligations are cumulative funding actions, not the value of work delivered.
- 1Awards are attributed by Unique Entity Identifier D27FSZD2L2U9, the government's own recipient identifier, not by name matching.
- 2Award records from USAspending.gov, last refreshed Aug 27, 2026.