Skip to content
BidBenchmark
Combined Synopsis/SolicitationAmendment 2

61--REPLACE MELROSE BACKUP GENERATOR

SER WEST(52000)

Response status

Historical record

May 11, 2026, 7:00 PM UTC

This notice is no longer open.

Posted
May 8, 2026
Archive date
May 8, 2027
SAM status
Active
This is a preserved solicitation record. The response window is closed because the published deadline passed.

Answer-first brief

What the source record says

  • SER WEST(52000) published this combined synopsis/solicitation.
  • Competition is listed as Small Business Set-Aside - Total.
  • The notice uses NAICS 238290 (Other Building Equipment Contractors).

Procurement identity

Notice ID
2330ca5b8a8b4e8ab3d16bbc06c265ad
Solicitation
140P5226R0006
Base type
Combined Synopsis/Solicitation
Version
2 of 2

Solicitation facts

Structured fields from the current SAM notice version. A dash means the source did not publish a value.

Notice type
Combined Synopsis/Solicitation
Solicitation number
140P5226R0006
Set-aside
Small Business Set-Aside - Total
Set-aside code
SBA
Posted
May 8, 2026
Responses due
May 11, 2026, 7:00 PM UTC
Archive date
May 8, 2027
Archive type
autocustom
Base type
Combined Synopsis/Solicitation
Organization type
OFFICE
Benchmark category
Category confidence
Category source
Last seen
Aug 29, 2026

Buyer and place

Office hierarchy and place of performance as published.

Department
INTERIOR, DEPARTMENT OF THE
Department code
Subagency
National Park Service
Subagency code
Office
SER WEST(52000)
Organization path
Organization path codes
Office address
TUPELO, MS, 38804, USA
Place of performance
City code
State
State code
Postal code
Country

Points of contact

Contact details from the current notice version.

Notice description

Source text reproduced without an AI summary.

Amendment 0001: Questions and Answers. 1. Consider a quote for materials only. No. The Government will not consider a materials-only quote for this requirement. The solicitation is for a complete firm-fixed-price generator replacement, including all labor, materials, tools, equipment, supervision, removal of existing equipment, installation, electrical integration, commissioning, load testing, training, and closeout documentation. Offerors must submit a complete turnkey quote that satisfies the full Statement of Work. Materials-only pricing will not be considered responsive to the solicitation. All other terms and conditions of the solicitation and Statement of Work remain unchanged. 2. Please advise if replacing the roof structure and new generator exhaust shall be included in the SOW as an alternate. The existing generator roof/cover structure is not identified in the Statement of Work for replacement. The Government does not intend to add replacement of the roof/cover structure as an alternate at this time. The existing roof/cover structure is bolted to the supporting steel posts and can be temporarily unbolted and removed, if necessary, to allow removal of the existing generator and installation of the new generator. The contractor shall field-verify existing conditions and determine the means and methods necessary to perform the work. If the contractor determines that temporary removal of the existing roof/cover structure is necessary, the contractor shall include temporary removal and reinstallation of the existing roof/cover structure in its price. If temporarily removed, the existing roof/cover structure shall be protected from damage and reinstalled in its current configuration unless otherwise directed by written solicitation amendment. Replacement of the roof/cover structure is not included in the current scope. The new generator exhaust shall be provided and installed in accordance with the generator manufacturer�s requirements, applicable codes, and the Statement of Work. The contractor may reuse existing exhaust routing/components only if compatible with the new generator, manufacturer requirements, and applicable code. Any required exhaust modifications necessary for a complete, operational, code-compliant installation shall be included in the contractor�s price. 3. Is there a requirement to replace the wire from the building electrical panel to the transfer switch? Replacement of the existing wire from the building electrical panel to the transfer switch is not included in the Statement of Work. The existing underground/building feeder route is located within the historic site context and is not intended to be removed, replaced, or re-routed under this contract. The contractor shall not disturb historic ground or replace the existing building-to-transfer-switch wiring unless specifically directed by written solicitation amendment. The contractor remains responsible for making the required exterior equipment connections, terminations, grounding/bonding, and code-compliant installation of the new generator and automatic transfer switch using the existing service conditions provided. Any work shall be limited to the generator/ATS replacement scope identified in the Statement of Work. 4. Sherwin-Williams is asking what the exact color number is that the end-user is looking for, if they have a specific manufacturer's color in mind. The contractor should submit actual color samples or manufacturer color documentation for review before ordering. The color needs to be reviewed in context with the Melrose setting and existing site conditions before final approval. Of the colors listed, Bottle Green 6007, Moss Green 6005, and Pine Green 6028 appear to be the closest options for consideration. Emerald Green 6001 appears less appropriate based on the name and general color tone, but final determination should be based on actual samples. The Government is not identifying a specific manufacturer�s color at this time. Final color approval should remain subject to COR review of submitted color samples/documentation prior to ordering.

Comparable award range

Historical award values for work matched by the fixed rubric—not an estimate of this opportunity.

No past awards scored highly enough to form a comparable range.

Comparable awards

The match score is decomposed so each comparison can be challenged.

No comparable awards are attached to this notice.

Amendment history

A version is preserved whenever the normalized notice contents change.

VersionNotice typeObservedResponses dueContent hash
1Combined Synopsis/SolicitationAug 10, 2026May 11, 2026, 7:00 PM UTC5c922eb64e0cd127
2Combined Synopsis/SolicitationAug 28, 2026May 11, 2026, 7:00 PM UTCeacb026807d06100

Record provenance

Field-level lineage for the current opportunity version.

FieldSourceSource as ofParserTransform
agency_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
archive_dateSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
archive_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
base_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
contactsSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
descriptionSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
naics_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
notice_idSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
notice_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_citySAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_country_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_postal_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
office_state_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
organization_typeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
posted_dateSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
psc_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
response_deadlineSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
sam_urlSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
set_aside_codeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
set_aside_label_rawSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
solicitation_numberSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
subagency_nameSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
titleSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3
upstream_activeSAM.gov Contract OpportunitiesAug 10, 2026sam_opportunity_snapshot@2026.08.22026.08.3

Sources and method

Figures on this page are computed from public federal award records. Numbers are never estimated or generated; where a figure is withheld, the reason is stated rather than filled in.

  1. 1Notice fields come from the SAM.gov contract opportunities record last seen Aug 29, 2026. SAM.gov remains authoritative.

Note 1 covers the solicitation record. No synthetic FAQ or inferred solicitation value is published.

61--REPLACE MELROSE BACKUP GENERATOR — federal contract opportunity · BidBenchmark